Before the Installation, you need to prepare some equipments such as Wrench box, chain hoist, tow rope, traction wire rope, wire rope sling, counterweight, forklift, truck crane, etc.
Installation Steps for Your Reference:
1. Fill the gearbox oil
2. guard rail installation
3. bridge platform installation
4. crane Electric box installation
5. Signage installation
6. end carriage installation
7. crane buffer installation
8. end carriage door installation
9. Trolley electric box installation
10. maintenance cage installation
11. cabin installation
12. counterweight placement
13. Ladder installation
14. Beam hoisting&Installation
15. Trolley hoisting&Installation
16. chain hoist traction beams
17. end carriage connection
18. cable guard rail installation
19. remove the counterweight
20. drag chain installation
21. wire rope torsion release
22. wire rope sling pull the wire rope to crane drum
23. wind wire rope on crane drum
24. lower wire rope for hook installation
25. main hook installation
26. deputy hook installation
27. installation completed.
Comments