Before installation, You need some Tools such as Wrench tool box, tow rope, gear oil, forklift, truck crane, etc.

The installation flow:
1. Fill the gearbox oil
2. Electric cabinet installation
3. End carriage connection
4. Buffer installation
5. Festoon track installation
6. Festoon installation
7. Maintenance cage installation
8. Beam hoisting&Installation
9. Trolley hoisting&Installation
10. Crab Hoist Trolley installation
11. Festoon cable connection
12. Conductor rail installation
13. Installation completed.